Kiribati Grid Connected Solar PV Power Station Project - Environmental Impact Assessment

Date modified: 15 February 2022

Environmental impact assessment done to evaluate the feasibility in installing a maximum of 900kWp PV solar power directly connected to the electricity grid of South Tarawa. Report prepared for the Ministry of Public Works and Utilities of the Republic of Kiribati and the World Bank. Report prepared by TRAMA TECNOAMBIENTAL TTA (Barcelona, Spain).

Dados e recursos

Rating

Informações Adicionais

Alternate Identifier https://pacificdata.org/data/dataset/kiribati-grid-connected-solar-pv-power-station-project-environmental-impact-assessment2
Issued 2020-04-06T06:20:39.730975
Modified 2022-02-15 03:19:36.022314
DCAT Type Texto
Contact Point
  • TRAMA TECNOAMBIENTAL TTA